0

Ability to Pause Manual Deployment/Execution

As a user I would like the ability to pause the deployment/execution process. Current the only option is to stop the process, after which I need to uncheck all of the boxes for steps that have previously been completed. This could be accomplish with the inclusion of a Pause button or by changing the behavior of the Stop button to uncheck the boxes for all steps that have already been completed, which would allow the use to click "Start" again to resume.

0 comments

Please sign in to leave a comment.