3

Periodical Full Load

To force a full load on Sunday for certain projects, currently we use a pre-execution script based on this: https://support.timextender.com/entries/20833922-How-to-do-a-periodical-full-Load-on-Incremental

Since SR1 does not support these pre-scripts in combination with threaded execution on a BU / DW level, it would be nice to have this as a general schedule option on the BU / DW / Project level.

A simple tick box that says: do a full load every xxx (week, month, day of week etc...). All TX needs to do in the background is truncate the _I and _V tables at the given schedule.

7 comments

Please sign in to leave a comment.