2

Copy/Paste Measures in Semantic Layer

It would be useful, to be able to copy/paste a measure in the semantic layer. Since there is no option to hide an intermediate measure, we often duplicate parts of the measure calculations, but it is quite time-consuming to re-map all the parameters.

0 comments

Please sign in to leave a comment.