We use perspectives in execution packages for the daily ETL-proces. Part of included tables are run incremental. We miss the option that triggers a full load on the perspectives.
By an incorrect loaded table, the table and all referred table has to be manual added to an execution package to load the data correct.
Please add the option to force a full load on the objects under a perspective.