Skip to main content
SUBMITTED

Allow use of Projecte Perspecives in Execution Package Full Load Objects section

Related products:TimeXtender Classic
  • March 19, 2026
  • 0 replies
  • 15 views

sten.lomme
Participant
Forum|alt.badge.img

In execution packages we can use Project Perspectives to limit what is included or excluded in the execution package (under Included Steps and Exclude Steps). This gives incredible flexibility.

Under the tab “Full load objects” however, it is only possible to select specific table objects or specific Business Units/Data Warehouses. It is not possible to use perspectives. This results in having to select every single individual object for full load.

Adding this feature would increase the flexibility to select which objects are fully loaded vs not. One could use the perspectives to dynamically select the full loads.