Ask general questions
Recently active
Dear Community, I have a few questions regarding transferring to another internal server and if you could help me with any of these questions help is appreciated. We have currently two servers running on SQL Server 2016, one server has the DEV and ACC environments and the second server has our PROD Environment (TimeXtender 20.10.39.64). The environments were installed by a supplier but their external employee left, so we want to try and install this on our own (with snapshots/backups in case something goes wrong). We want to try and move the DEV/ACC environment to a new server which has the same TimeXtender version but SQL Server 2019. For this move I have 3 questions: Can I just export and import the project from old server to my new server and load the data again into a new SQL database? How can I set up my environments in such a way that my DEV → ACC → PROD traject isn’t changed. I could not find those settings and had trouble finding them on the legacy page. As the DEV/ACC environm
Hi, I need it for a customer. I think i have seen something, but can’t find it now. BR Anders
Hi, I previously obtained my TimeXtender Solutions Architect certificate. How can I get the badge to show up in the community? Kind regards, Andrew
Good afternoon, When I transfer my project from our DEV to PROD environment, it takes over 25 minutes. I also have the same problem when opening the project from PROD to deploy and execute changes. Is there anything I can do in order to make these times more manageable? Thanks, Chuck
Hi all, Congratulations with the TimeXtender Community portal. It looks way better than the ‘old portal’. I have a question about the badges. Because I passed the ‘Solution Architect’ exam, I’ve earned a badge. I’m wondering, what badges are available, what do they mean and how to earn them?
Did anyone tried to rename or modify the source code on system fields from being 'customdata' based on the filename or business unit you are unloading a text or excel file? I would really love this as this source code is one of my primary keys and it's uniform irrespective of the business unit I unload the data becoz of excel docs being used.
Hello, I defined a Project Variable where I casted the output as date,When using the variable in a view TX returns an int.What am I doing wrong?
Hi, I've been trying to configure the ODX server properly in order tot est TX and complete the course, but I'm having some difficulty. I've downloaded both ODX and TX, I have activated them with the key and client secret; I've made a new local user in the Admin group called TX Service; I've given this user sysadmin rights in the newly created database TX_project_repository. Now if I try to load data on this screen, it fails: With the following error in the log: Seems like it cannot access the database. The service is also not functioning, trying to jumpstart the scheduler manually gives this error: Please advise me on this issue.
Hi all, Our project has work items that have been left by several folks who have since left the company. Their accounts no longer exist, so we can't log in as their old users and remove them. Is it possible to remove these work items some other way?
I am unable to set up my notifications. I get the following error message: I already tried different email addresses (gmail, outlook, hotmail) with different ports. I also enabled the option within my mail accounts to allow external programs to make a connection. But it still isn't working. Is this a know issue or am I doing something wrong?
Morning guys, Hope you can help. I am getting this error and not sure what is causing that. I have attached the screenshot of the error. I have an insert statement which run the query shown and been trying to see what can I be doing wrong.
Is there way to adjust the window widh according to the screen size. It is not getting resize.
Hi , our DH setup consists of multi-layered datawarehouse whereas BI client (tableau ) only interfaces the upper tier: MDW DWH. Having semantic layer for each dashboards (we have quite a few), we would like to move out of the single core TX project with multiple semantic layers to a project for each dashboard (semantic layer). By doing so, we can make sure that each developer works on his own project without "stepping on each other toes" (I'm aware of collabaration features of TX) and keeping our core project unharmed. So, the challenge is how to reuse objects created in the core project (preferably VIEW to reduce space/redundencies) in entire new project (same server/database) My approach was creating a new project, add MDW datawarehouse and then utilize External SQL Connection to connect to the same DWH (transfer type connection). I've also created a seperate database schema with valid behaivor. The problem we ran in was that designated table was the same as similar table in the daat
Hello fellow TimeXtender users, We were wondering: is it worth upgrading from SQL 2014 to 2016 in the scenario where we use TX traditionally: stage - dw - cubes. Has anyone done it and have you seen performance improvements? Thanks! Wim CALM - Co
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.
We use cookies to enhance and personalize your experience. If you accept you agree to our full cookie policy. Learn more about our cookies.
We use 3 different kinds of cookies. You can choose which cookies you want to accept. We need basic cookies to make this site work, therefore these are the minimum you can select. Learn more about our cookies.